Monday, January 28, 2019

More road works in our area

It's more than seven years ago that builders started digging up roads in Larnaca (and, we assume, other towns around Cyprus) in order to instal the new sewage pipes. The ones for storm drainage seem to have taken effect, and despite an extremely wet winter we have not seen any flooded streets in our neighbourhood.

Our street had its pipes installed in September 2011. Richard asked one of the builders when they expected the houses to be connected to the massive new mains drainage system, and was told, 'about five years'. He thought, at first, that the builder (whose English was not entirely fluent) had mistaken the period, and meant 'months'. I was more cynical. I reckoned five years was probably an optimistic estimate.

It turned out that I was right. Five years later, we had heard nothing. It wasn't until this time about a year ago that we received our official letter telling us that we needed to get our septic tank sealed, and the connections made so that we could be joined to the main drainage. The letter was all in somewhat complex Greek, but Google Translate is pretty good these days, and I can type Greek almost as fast as I type in English.

The main part of the letter said (in translation):

Please be advised that the sewer council of Larnaka (SAL) has completed the construction of the drainage system in your area and you can proceed with the connection of your premises after first submitting a request and obtaining the required permit. The application should be submitted on the attached form.

The SAL undertakes that the construction license will be issued as soon as possible, meaning that the application will be complete and accompanied by all required documents and documents. Then, with your own contractor and on the basis of the license you secure, build the private construction of your building. The Technical Inspector of the SAL will carry out an on-the-spot check on your contractor's (or your own) presence as soon as possible after your call. If the private building sub-building meets the technical specifications of the SAL, the Technical Inspector will issue the consent to link your property to the sewerage system.

Submitting an ΙΥΟ license and obtaining consent for a connection is also mandatory even where the private system is built.

For your convenience, we attach all the information you need to submit your application for an IYO, that is, the application form and the technical specifications. We furthermore inform you that the relevant information and these documents can also be found on the website www.lsdb.org.cy

If you have submitted an application for the construction of a IYO and you have obtained an IYO construction license and a certificate of consent for the connection of your premises, please ignore this letter.

It is noted that the connection of your premises is mandatory and must be completed within six months from the date of notification, ie until 08/06/2018.

It all sounded rather confusing, and we didn't do anything for the first few weeks. But then gradually our neighbours started having extensive (and very noisy) digging done. So Richard contacted a friend to ask who she used as a contractor. We were given a contact number, and a helpful guy came over to look at what we have currently. He explained that first we had to employ an architect to draw a detailed plan, then that had to be submitted to the sewage board for approval. They would grant a license, and we could then employ a builder he would recommend to do the work.

He told us that there was a long queue for this, and no, it couldn't possibly be done by the end of June, but that didn't matter at all. We said we would be away for six weeks over the summer, and he shrugged and said that nothing would happen in July and August anyway, so we didn't need to worry about it till the autumn.

A very competent architect came over, took extensive notes, and went away. A couple of weeks later she brought us the plans and charged us eighty euros. It seemed like a reasonable fee for some highly detailed drawings. She said that she had already submitted the plans to the relevant board, and gave us the reference number.

Summer came and went, and by the end of September we had heard nothing. So Richard phoned the number we were given by the architect. He was told that yes, our application was in process, and we should hear something by the end of the year.

Sure enough, last Monday there was another letter in our mailbox.

Notification that we have a license to connect our drains to the mains sewerage system in cyprus


This one (according to Google Translate, again) told us that our application had been accepted, and that we had to go to the sewerage board to collect our license. It would cost us 60 euros, and after collecting it we should employ a builder to make our connections. At last!

It was rather a busy week, so it wasn't until Friday that we went to the sewage office. It was a bit complicated to find, but well-signed:

Larnaka sewerage board building

The letter told us to go to the first floor, so we did that, and handed over sixty euros. We were given a receipt and told to go to the second floor, where we were finally given our sewerage connection license. It says that it was actually granted on December 17th, but the letter was not written until January 3rd, and did not arrive in our mailbox until nearly three weeks later - we have no idea why the internal Cyprus post is so slow, but this is not unusual.

Richard phoned the original contact in the afternoon, who said he would come over with the builder soon, to give us a quote, and then, hopefully, the work can start.

All of which is great, even if it has taken significantly longer than usual.

But... this is Cyprus. Nothing is ever straightforward.

On Tuesday, there was another letter in our mailbox. This one was just a brief notification:

notification that our street in Cyprus will be re-surfaced

The word 'ΟΔΟ' means 'street', so we were amused that instead of putting in our street name, whoever filled this in merely put 'ΣΑΣ' (which means 'your').

We were less amused that this turns out to be a notification that our street is going to be resurfaced.  Finally.  Over seven years since it was given its temporary resurfacing after the initial digging for sewers.  And then we will be employing someone to dig part of it up again in order to make our connection.

Sigh.

On Wednesday and Thursday last week the former surface was dug up and the rubble removed, leaving it like this:

Larnaka street awaiting re-surfacing

Some other streets in the neighbourhood have also had their surfaces removed, so we assume they are finishing that process before starting the resurfacing. It will be very nice to have roads that are less bumpy, and look smarter...

Until our builders arrive and dig it up again. 

Tuesday, November 20, 2012

Another walk and some vanishing trees


My early morning walks with Sheila have turned into a pleasant, regular habit three times per week. We communicate via text when we have both woken up, and usually leave our respective homes somewhere between about 6.00 and 6.15am. It's a pleasant time of day... or has been. Today there was quite a chill in the air, and I was glad of my long trousers and light jacket.
As we approached the Salt Lake trail, the area seemed lighter than usual. There was a gap, where previously there had not been a gap:


I'm not particularly observant, particularly at that time in the morning, but Sheila commented that this empty ground had been full of trees and bushes only yesterday. 

We didn't walk quite as quickly as usual, because Sheila's youngest daughter was with us, half asleep on her back. And while the sunrise wasn't as stunning as some of the recent ones we've seen, I took a photo anyway - most of the picture appears darker than it was in reality due to the sun shining so brightly:


On our way back, the newly cleared area was even barer looking, and a digger of some kind was busy taking out more trees:


We have no idea why this would be happening. Perhaps it's related to the new sewerage pipes. Or maybe they're even going to build more houses here, although it seems unlikely; there are far too many construction sites already, either half-done, or lying empty. 

When I arrived home and took my shoes off, I was greeted by Tessie who was very happy to have my shoe box entirely to herself: 


Still, I did manage to get one of my shoes in...


Friday, September 23, 2011

Construction work almost finished in our street... maybe?

Life seems to have been dominated, recently, by the sewerage pipes being put down in our neighbourhood. It's noisy, and dusty, and means that people driving to or from our house have to find new routes almost every time, since different streets are closed off in the area.

The first digging in our little bit of street happened just over three weeks ago. A day later, the noise was considerably worse and the disruption extensive. Then we had a little peace, until they started digging trenches across the road, to join (eventually) with our septic tanks.

As I explained in the last of those posts, the workmen then roughly covered over the holes, leaving the road bumpy but useable. As it remained until a few days ago, when the diggers and other noisy machines came back. Slightly to our surprise, they dug up the top couple of inches along all the channels (lengthways and crossways) that had been roughly surfaced, and removed all the excess rubble. it looked rather neater than it had done:


But made the road, once again, unusable for cars. And it all seemed remarkably inefficient... why put the rough surface down, we wondered, if they were going to dig it up again a week later?!

The following day, all was quiet. At least, it was in our street. We heard the ongoing rumble of digging and other construction work in other roads nearby.

Then, after the time when the workmen usually finish, they arrived with just one machine, and painted some kind of tarmac along all the new shallow channels. Perhaps they needed to seal them in some way:


There were barriers and diversion signs at both ends of the road, but they didn't stop an intrepid driver who drove half way along the street, bumping noisily in and out of the channels, making me wince each time and wonder just how much damage had been done to a rather new-looking car.

However, almost opposite our house the driver got stuck in a slightly wider hole, and had to reverse out after rather a struggle. Then performed something like a 23-point-turn to turn the car around... which was finally achieved to the accompaniment of applause from several of the neighbours who had gone out to watch.

The following day, the workmen returned, starting at 7.00am as usual, and working through the day. This time, they managed to fill in all the shallow holes on one side of the road, meaning that cars could at least get along it without bumping up and down too much:


I took that picture just after several of the neighbours had been out with their hoses, washing down the street, as Cypriots love to do.

And today, at last, the road itself is completely done. At least, the surface is smooth.

Well, fairly smooth.

It would have been too much to hope for a complete re-surface, but it definitely looks better, although it's hard to tell from this photo:


- the only thing now lacking is access into driveways, where the pavement is still rough and unfinished.