Tuesday, June 21, 2022

Restoration of Bathroom Renovation

 In my previous blog post, I mentioned that we were having some work done upstairs, and that I would write about it when it was complete. 

To introduce it, I need to backtrack six years, when we employed a local builder to remove the old-fashioned bathroom from our house and instal a new one, with an extractor fan, better lighting, and an altogether more modern appearance. We were very pleased with the result. 

Anyone who is curious to read more about it can check the lengthy post I wrote at the time about our bathroom renovation

However, about a week after we had been using the new shower regularly, I realised that a couple of the tiles around the tap didn't look quite the same as the rest. I thought I was imagining it at first. Then I wondered if we had somehow bought a box of tiles in a slightly different shade but hadn't noticed at the time. This theory was disproved when a third tile started changing colour. And we found some water on the floor. It wasn't just shower water that had splashed over; this was behind the bath, where there shouldn't have been any water.

And then we noticed some of the paint starting to bubble on one of the walls. We contacted the builder - I don't recall the time-frame, but it was probably some months after the renovation. He came back, and said that the bubbly paint was possibly due to the plaster not having dried out fully before it was painted. He was more concerned about the water and the different shades on the tiles, and he managed to find a joint that wasn't quite right. 

He said he had employed a plumber who rushed his work and had made some other mistakes. So he fixed this leaky pipe joint, and said he would talk to his brother - who is a plasterer - about getting the bubbly paintwork dealt with. 

Time passed. Not months but years.  If we were away for more than about a week, we returned to find that all the tiles were the same colour, but a couple of days later, with regular shower use, the ones around the taps turned back to the different shade.  And the patches with bubbly paintwork turned into large patches of bare wall, including one in the wall outside the bathroom which seemed to be getting worse and worse. 

The builder and his brother did come and look at the bathroom a couple of times, where the walls were getting worse, and said they would come back some time. But they're very busy with other work, and it didn't happen... and we didn't know anyone else who would be able to do the work. Word of mouth is the best way to find skilled handymen here, but unfortunately most of the people we knew with experience of this kind of thing had been disappointed (or worse). The people we used were some of the best locally. 

A young friend who had done some other work for us suggested that perhaps the sealant around the bath was causing the tile problems, and added some more. It looked good, but didn't seem to make any difference to the colour of the tiles. 

More years passed, with the pandemic stopping everything from happening, and finally we talked to another young friend, whom I will refer to as L, the son of some close friends who has worked with a builder in the UK, and did some excellent plastering for us downstairs. He doesn't particularly like working inside - his passion is horticulture - but he said he thought he could fix our problems working just an hour or two per day for a couple of weeks. 

This is what the wall outside the bathroom looked like when L had removed the radiator, and chipped away the loose plaster. He said the wall was very damp, so clearly there was a problem inside the wall, one which he could only tackle from the bathroom side. 


This was what the wall inside looked like: 

And this is the wall opposite, where plaster had fallen away but it was no longer damp, and it had stopped getting worse. The problem that caused this was that the exterior wall had been sucking in water; a year or so ago L had painted the outside wall, which stopped any more damp getting in.


A couple of days later, the tiles around the taps looked like this:


In pulling away the worst of the tiles, L discovered others that almost fell off the wall. 

The timing worked well, as there were no visitors in our guest flat during May, so we were able to go downstairs to shower. Not ideal, as the guest flat stairs are outside, but we were thankful to have that option while the bathroom was unusable. 

We were also very thankful to have discovered an almost-full box of the tiles. That meant we didn't need to try to find matching tiles, or - worse! - replace all the tiles. And in feeling around the plumbing, L found a place that was wet - a joint that had never properly been made, which was the cause of the leaking. At least, he hoped that was the only cause. He managed to fix it, and then we had to wait for everything to dry out. 

All seemed to be dry a week or so later, so he started plastering. First he used the mixture commonly used in Cyprus that looks to us more like concrete:


He plastered the other walls too, and then we had to wait for those to dry out. May was a good time for this to happen; it was warm but not yet humid, and we were able to use a small upright fan to help the process. 

Over the course of the next few days, further plastering happened. Then there was a big leap forward in terms of appearance ,when L called in his brother J to help with the tiling. 


Alex, who appears sporadically in this blog, assumed that the dust sheet was put there for his comfort, and tried to persuade us to turn on the taps to give him a drink. He was rather annoyed when we refused, not wanting any excess water until everything was complete. 

The walls opposite and outside were also being plastered, and sanded, and skimmed, and looked better than they had in years.


Since we were having all this done, and since our previous shower fittings had become quite corroded, we decided to splash out (so to speak) on new fittings, which improved the appearance significantly: 


I wouldn't have minded too much if we had had to change the colour of the bathroom walls, as the orange used six years ago was rather more vivid than I had anticipated. But when we found a half-full pot of the paint, it was an easy decision to use that rather than embarking on a complete re-paint. Richard and I did the painting (mostly Richard) and at last, over a month since it was started, our bathroom was back to how it was after the first renovation six years ago:


It was very good to be able to take a shower in our bathroom again after more than three weeks of having to go down two flights of stairs (one of them outside). We know we're very blessed to have options like this, but guests were expected for our flat early in June. 

Here's the wall next to the bath:


And here's the one opposite:


The only thing remaining was for L to cut some more skirting board pieces and fit them, which he did a few days later. 

We've been using the shower for nearly four weeks now, and are delighted - and relieved - that none of the tiles is showing any indication of changing colour, nor is any of the plaster bubbling or crumbling. And, as mentioned in the previous post, our Roomba has worked hard at eliminating the last of the plaster dust. L did an excellent job tidying and sweeping every day he came, after finishing, but inevitably there was fine dust that kept falling. 

We hope that this bathroom renovation will last considerably longer than six years, and appreciate it all the more after having been unable to use it for most of May.

1 comment:

Anonymous said...

Glad your patience has been rewarded, and all is finally well. Long may it
continue to be so.