 In my previous blog post, I mentioned that we were having some work done upstairs, and that I would write about it when it was complete. 

To introduce it, I need to backtrack six years, when we employed a local builder to remove the old-fashioned bathroom from our house and instal a new one, with an extractor fan, better lighting, and an altogether more modern appearance. We were very pleased with the result. 

Anyone who is curious to read more about it can check the lengthy post I wrote at the time about our bathroom renovation

However, about a week after we had been using the new shower regularly, I realised that a couple of the tiles around the tap didn't look quite the same as the rest. I thought I was imagining it at first. Then I wondered if we had somehow bought a box of tiles in a slightly different shade but hadn't noticed at the time. This theory was disproved when a third tile started changing colour. And we found some water on the floor. It wasn't just shower water that had splashed over; this was behind the bath, where there shouldn't have been any water.

And then we noticed some of the paint starting to bubble on one of the walls. We contacted the builder - I don't recall the time-frame, but it was probably some months after the renovation. He came back, and said that the bubbly paint was possibly due to the plaster not having dried out fully before it was painted. He was more concerned about the water and the different shades on the tiles, and he managed to find a joint that wasn't quite right. 

He said he had employed a plumber who rushed his work and had made some other mistakes. So he fixed this leaky pipe joint, and said he would talk to his brother - who is a plasterer - about getting the bubbly paintwork dealt with. 

Time passed. Not months but years.  If we were away for more than about a week, we returned to find that all the tiles were the same colour, but a couple of days later, with regular shower use, the ones around the taps turned back to the different shade.  And the patches with bubbly paintwork turned into large patches of bare wall, including one in the wall outside the bathroom which seemed to be getting worse and worse. 

The builder and his brother did come and look at the bathroom a couple of times, where the walls were getting worse, and said they would come back some time. But they're very busy with other work, and it didn't happen... and we didn't know anyone else who would be able to do the work. Word of mouth is the best way to find skilled handymen here, but unfortunately most of the people we knew with experience of this kind of thing had been disappointed (or worse). The people we used were some of the best locally. 

A young friend who had done some other work for us suggested that perhaps the sealant around the bath was causing the tile problems, and added some more. It looked good, but didn't seem to make any difference to the colour of the tiles. 

More years passed, with the pandemic stopping everything from happening, and finally we talked to another young friend, whom I will refer to as L, the son of some close friends who has worked with a builder in the UK, and did some excellent plastering for us downstairs. He doesn't particularly like working inside - his passion is horticulture - but he said he thought he could fix our problems working just an hour or two per day for a couple of weeks. 

This is what the wall outside the bathroom looked like when L had removed the radiator, and chipped away the loose plaster. He said the wall was very damp, so clearly there was a problem inside the wall, one which he could only tackle from the bathroom side. 


This was what the wall inside looked like: 

And this is the wall opposite, where plaster had fallen away but it was no longer damp, and it had stopped getting worse. The problem that caused this was that the exterior wall had been sucking in water; a year or so ago L had painted the outside wall, which stopped any more damp getting in.


A couple of days later, the tiles around the taps looked like this:


In pulling away the worst of the tiles, L discovered others that almost fell off the wall. 

The timing worked well, as there were no visitors in our guest flat during May, so we were able to go downstairs to shower. Not ideal, as the guest flat stairs are outside, but we were thankful to have that option while the bathroom was unusable. 

We were also very thankful to have discovered an almost-full box of the tiles. That meant we didn't need to try to find matching tiles, or - worse! - replace all the tiles. And in feeling around the plumbing, L found a place that was wet - a joint that had never properly been made, which was the cause of the leaking. At least, he hoped that was the only cause. He managed to fix it, and then we had to wait for everything to dry out. 

All seemed to be dry a week or so later, so he started plastering. First he used the mixture commonly used in Cyprus that looks to us more like concrete:


He plastered the other walls too, and then we had to wait for those to dry out. May was a good time for this to happen; it was warm but not yet humid, and we were able to use a small upright fan to help the process. 

Over the course of the next few days, further plastering happened. Then there was a big leap forward in terms of appearance ,when L called in his brother J to help with the tiling. 


Alex, who appears sporadically in this blog, assumed that the dust sheet was put there for his comfort, and tried to persuade us to turn on the taps to give him a drink. He was rather annoyed when we refused, not wanting any excess water until everything was complete. 

The walls opposite and outside were also being plastered, and sanded, and skimmed, and looked better than they had in years.


Since we were having all this done, and since our previous shower fittings had become quite corroded, we decided to splash out (so to speak) on new fittings, which improved the appearance significantly: 


I wouldn't have minded too much if we had had to change the colour of the bathroom walls, as the orange used six years ago was rather more vivid than I had anticipated. But when we found a half-full pot of the paint, it was an easy decision to use that rather than embarking on a complete re-paint. Richard and I did the painting (mostly Richard) and at last, over a month since it was started, our bathroom was back to how it was after the first renovation six years ago:


It was very good to be able to take a shower in our bathroom again after more than three weeks of having to go down two flights of stairs (one of them outside). We know we're very blessed to have options like this, but guests were expected for our flat early in June. 

Here's the wall next to the bath:


And here's the one opposite:


The only thing remaining was for L to cut some more skirting board pieces and fit them, which he did a few days later. 

We've been using the shower for nearly four weeks now, and are delighted - and relieved - that none of the tiles is showing any indication of changing colour, nor is any of the plaster bubbling or crumbling. And, as mentioned in the previous post, our Roomba has worked hard at eliminating the last of the plaster dust. L did an excellent job tidying and sweeping every day he came, after finishing, but inevitably there was fine dust that kept falling. 

We hope that this bathroom renovation will last considerably longer than six years, and appreciate it all the more after having been unable to use it for most of May.

Saturday, May 21, 2016

A few more additions to our house...

In this, the tenth anniversary of our selling our UK house and buying one in Cyprus, we have done a LOT of renovations and repairs. Some of them should really have been done years ago, including repairing some of our rotting windowsills and frames, but we're not very good at making decisions or at getting around to this kind of thing.

So we started by employing a teenage friend to some painting, and he did such a good job that he's done a great deal of sanding, repairing and more painting, and even some plastering.

In the middle of that, we had a damp-proof course installed. While it's still early days, and hard to tell now that the weather's warmer, we do think our guest flat seems to smell less damp and the kitchen and bathroom cupboards are a lot less musty.

Then we did the most major work of all, having our bathroom renovated. I'm still glad I was out of the country while that was going on, and am very much appreciating the new bathroom. It was basically complete about a month ago, but since then we've done a few extra bits and pieces - I bought a wooden toilet-roll holder in the UK, and Richard put that in.

We replaced the bathroom bin and loo-brush holder, both of which were ancient, and even bought some new scales when Lidl had some on special offer.

We spent a lot of time looking for towels, either in cream or peach, but couldn't find any at all despite searching in several shops locally.  The towels we had been using were ten years old and getting rather scruffy as well as having lost any hint of fluffiness. They were cheap ones and served us well, but having spent a significant amount on the new bathroom, we thought it deserved new towels.

We also realised that there was a bit of a gap in the corner next to the toilet, and that we needed somewhere to store toilet rolls. So after much pondering, we decided to buy another Ikea unit, in the same range as our sink cabinet and mirror.

The shelf in the middle clearly needed a plant, so we spent ages looking for one that would survive in partial shade and would not need too much attention, and are happy to report that, four weeks later, it's not just alive but has some new leaves:


Any time we go to Ikea - which is just outside Nicosia - we seem to find several other things we weren't expecting to buy... and in this particular trip, we found some rather nice brown towels, both large bath sheets and some hand towels that would fit perfectly on our towel rail...


... and even a matching bathmat.


Bathroom complete, we didn't want to do anything else major, but we realised we had a new problem. For the last few years we have used an upright fan in our bedroom overnight, from about May through to October.  In the hottest weather, when the humidity is high, we use our air conditioning too, but right now the heat is dry, and a fan is all we need.

The trouble with the fan was that in order for it to be effective, it had to be in a place where Richard tripped over it or bumped into it almost every night. So he thought about affixing a wall fan in a corner, out of the way. I don't think wall fans look particularly nice and didn't know if it would work well enough, so for a few days recently we put the upright fan on top of the chest-of-drawers, and angled it with a couple of books underneath... far from ideal.

The obvious solution is one we had thought about ten years ago... a ceiling fan. We even bought one at Kleima, but it had the wrong kind of fitting so ended up in our guest flat. We had thought that nice ceiling fans, such as we have in our living areas (bought second-hand just before we moved in, from friends leaving the island) would be very expensive new.

But Leroy Merlin, a big hardware/DIY store in Nicosia (not far from Ikea) sells ceiling fans at very reasonable prices. So we went there yesterday, and bought ourselves a ceiling fan, of very similar style to our others. It's perhaps twice the price of an upright fan, but the ones we have elsewhere have lasted well over ten years, whereas upright ones tend to stop working after three or four.

Richard and Tim, between them, put the ceiling fan up yesterday afternoon....


I think it looks good - and more importantly, it was absolutely wonderful overnight. I felt pleasantly cool, Richard even complained of being cold this morning.

As I write this, the ceiling fan in my study is on, providing a pleasant breeze; they are wonderful inventions, and I am so thankful we now have one upstairs too. 

Sunday, April 17, 2016

The Bathroom Renovation....

It's almost three weeks since I wrote about our proposed bathroom renovation, with the reasons for going ahead, and what we were planning. I was very pleased to be flying to the UK the following day... or so I thought. In the event, my flight for March 29th was cancelled - apparently one of the airline staff was ill - and rescheduled for the following evening.

I could have gone to a very nice hotel for 24 hours along with most of the other passengers, but decided I'd rather come home. It was useful in that I was able to pay some bills and catch up with a few things I'd neglected. But it was VERY noisy.

I had assumed, in my ignorance, that on the Wednesday, when work finally began (after a two-day delay) that the builders would first of all work on our guest flat shower, taking out the old one and installing the new one.

Wrong.

The guy who came was the demolition expert. So he did take out the guest flat old and tatty shower, and left it pretty tidy, but he then got straight to work starting to demolish our bathroom.  I didn't want to look at first, but after some hours I took a look:


Since the tiling had been done thoroughly, and expertly, over the entire bathroom, it wasn't an easy task to remove them. And the noise was horrendous.

Had my flight been cancelled again, I would have taken up the option on a hotel rather than returning to the house for another day of destruction!

Happily my flight went ahead on the Wednesday evening; I arrived in Liverpool about 1am UK time, and I spent the night in the nearest airport hotel; Richard had re-booked everything for me after the cancellation, and I was very pleased indeed to have somewhere to crash out for a night:


On the Thursday morning, the last day of March, I caught various coaches that took me up to Carlisle, and a wonderful reunion with my son, daughter-in-law and toddler grandson.

I had little thought to spare for the continued destruction of the bathroom, but Richard took photos such as this one, after more of the tiles were removed:


And this one, after the builders discovered that the entire bath was sitting on a slurry of concrete:


And this one, at the end of the day, after they had tidied up and removed the bath.  Alex was quite disturbed by it all, but determined to investigate:


Friday April 1st was a public holiday in Cyprus, and Richard had arranged to go sailing. So work was halted for a long weekend. And they still didn't install the guest flat shower. Thankfully we do have another loo; we also have another shower - in a sort of cupboard in my study. We use it for keeping heaters and/or fans (depending on the season) and our beach equipment. So he took everything out of it, and used the shower there for the duration.

Meanwhile, I was having fun with my grandson in the UK, where it was a bit grey and showery. But the only noise was that of a cheerful toddler, and the bathroom was functional!


On Monday April 4th, the work resumed. I had really hoped they'd have started installing the new bathroom by then, but no... there was yet more preparation work to be done, uncovering and moving piles, drilling more holes and doing some initial cementing:


And here's how it looked by the end of April 5th - not much different, but by now there were new channels dug into the floor and more concreting done:


Meanwhile in the UK, my grandson wasn't too well during the day, but enjoyed tucking into some curry and naan bread in the evening: 


Wednesday April 6th was both sad and happy for me: I had to say goodbye to my family in Carlisle, but the train took me south to stay with my father and his wife in the Midlands. It was very good to see them and to catch up with my siblings and their spouses too, at the weekend.

Back in Cyprus, there was some progress, in that the walls received their first cement 'skim':


But a day later, although it had dried out, it didn't look much different and I was beginning to wonder if we'd ever have a bathroom back again. I think Richard was getting a bit concerned too...


Then on Friday 8th - the day when it should all have been complete - construction began, and the tiles were put on two walls:


The builders realised that there was an imminent deadline: Richard was leaving the country on Tuesday 12th, so they worked through the weekend, grouting the tiles, laying the floor, and doing the electrics and lighting.

We had chosen some light orange paint for the other two walls - not wanting the entire thing tiled again - so that was the next task. By the end of Sunday 10th April, there was a shell with plumbing complete, lights installed, and tiling and painting done. It still looked a bit depressing.


And then it all started to come together on the Monday, more so on the Tuesday morning. By the time Richard departed for the airport, he was able to take this remarkably different picture:


I had to say another set of sad goodbyes, and travelled down by coach to meet Richard at Gatwick. We were able to spend a day and a half with his mother, and to my surprise the thermometer rose and the sun came out. Tuesday, when we went out for the day, was apparently the warmest of the year so far:


On Thursday we were back at Gatwick. I flew back to Cyprus in the evening, and about an hour later Richard flew in a different direction to some work-related meetings.

I felt a bit bad that Richard had put up with all the noise and chaos, yet I was the first one actually to use the new bathroom. It felt a bit strange at first, and the bath surface was so slippery that I went out and bought a non-slip mat as a temporary measure. When he's back we're going to put up some hooks, and pictures, and buy some new towels... but it's a very pleasant bathroom which looks amazing, and - due to an efficient extractor fan - should no longer attract mould.




Monday, March 28, 2016

Replacing our bathroom....

It's coming up to ten years since we moved into our house in Cyprus. It's more than ten years since we first saw it, and pondered, and prayed, and decided that it was the right house to buy. As, indeed, the past decade has amply demonstrated.

But back in January 2006, we didn't know what to expect. We didn't really know what we were looking for although we had a few important criteria. At first we tried to find a four-bedroomed house, but they were too expensive in the area we wanted to live. So we started looking at three-bedroomed houses... only to have an estate agent take us a three-storey house which had three bedrooms on the ground floor, which is a separate flat, AND three bedrooms on the top floor, as well as a good-sized room off the living room which could be used as another bedroom.

We fell in love with the kitchen immediately, we saw lots of potential in the main living area, and although the bedrooms seemed a bit small compared to the ones in our rental home, we knew they would be fine.

But we really didn't like the bathroom.

It's not that it was too small, but there was a huge sink unit that seemed to take up almost half the floor space, and there was mould growing around the bath sealant (although everything else was scrupulously clean):



We really didn't like the colour, either. And whereas we could easily repaint other rooms (and did so before moving in) it's a lot more difficult to change bathroom tiles.

Thinking about the bathroom almost put us off the house entirely, but we went back for a second viewing. When we saw it again - and I took the above photo - we realised it wasn't as bad as we had remembered. We still didn't like the style or colours, but it was quite adequate; a great deal better than the one in our rental home (of which I don't think any of us ever took any photos).

Besides, with the amount we sold our UK house for, we had some 'change' when we went ahead with buying this one. We used some of it to buy important items such as a large freezer, and an electronic piano, and a television (since our previous one had quit some months previously), as well as a few extra bookcases. But we promised ourselves that once we'd settled in, we would do something about the bathroom.

Time, as it is wont to do, passed.

Richard replaced the sealant around the bath.


A few years ago, he managed to cut down the shower doors which were a bit broken and somewhat mouldy.


But it's continued to cause frustration. Nothing major, in the scheme of things, but it gets very damp, and the condensation turns to mould on the ceiling and wall tiles. I clean them regularly, but it grows back, and we don't always notice black on the ceiling. We could keep the window open, but it would be VERY cold in the winter. What it needs is an extractor fan... but that's not an easy thing to install without taking the bathroom apart.

The radiator, too, is extremely rusty. Each year it looks worse, and we wonder if it's going to leak. We muttered that it would be nice to have a heated towel rail...

We're not good at getting around to doing things, and time continued to pass, but we seriously needed a new shower on the ground floor (which we use as a guest apartment). The doors have been wonky since we moved in, and are getting worse. There's mould there too. And we have been given money specifically for the upkeep of the guest flat...

So at the end of last year, we started looking at new showers, and other bathroom fittings, curious to know what was available, and what the likely cost would be, and whether we would even be able to find anything suitable.

Finding a new shower for the guest flat wasn't too difficult, but we also wanted to know what might - theoretically - be possible in our main bathroom. We discussed having only a shower with no bath, to make it feel bigger. But occasionally we both like to take a bath, and it's important to have one for visiting children.

Visiting the bigger DIY stores was discouraging; nothing was inspiring, and we'd almost given up when we decided to look at a local bathroom supplies place. There we saw a corner bath, the kind of thing Richard had always rather craved, which would take up rather less space (or less awkward space, anyway) than our current bath.

We saw a sink we liked too, and Richard said he would be able to build a small, neat shelved unit to go around it.

I didn't think we needed a new loo; this is our current one:


But they're not expensive, and this one has a lot of scale (and needs a new seat lid anyway)... so we thought that if we were buying the rest new, we should go ahead with that, too.

We contacted the builder who has done some other work on the house, and he gave us a quotation for doing the entire bathroom - removing all the tiles and old units, plumbing in the new ones to our specifications, re-painting the ceiling, doing any necessary plastering, putting up tiles... at least a week's expert work. It wasn't cheap but not unreasonable either.

Richard was eager to go ahead, but I was still resistant. Partly because I have an inherent dislike of spending money on myself (part of my Scottish heritage, perhaps) and also partly because I find it extremely stressful having builders in the house, no matter how friendly and efficient they are. There's inevitable noise, and dust, and chaos... I really, really dislike it.

But I'd been wanting to spend a couple of weeks in the UK visiting relatives, as it's over a year since we've been, and so the idea formed that I would go on my own, and Richard would get the bathroom done in my absence.

The vague idea turned to more concrete plans in the past month. My flights and other travel arrangements are booked, and one of our bedrooms is currently full of bathroom fittings and fixtures. We've chosen tiles and paint, and the builders are booked for this week. They're going to replace the guest flat shower first, and that should have been happening today.

This morning Richard had a message to say that they're going to start a day late. They're still finishing a previous job that took longer than expected.

I can't say I'm unhappy about that. That means they'll do the guest flat shower tomorrow, and probably won't start work on the main part of the house until Wednesday, by which time I'll be a few thousand kilometres away.

The only slight problem is that the heated towel rail (to replace the rusty radiator) was not in stock when Richard put the order in, so had to be ordered from abroad. And last week there was a port strike in Limassol. I gather it's now been called off, so we hope that shipments will be unpacked and will make their way to the relevant stores in time for us, and for the many other frustrated customers awaiting bathroom and other parts.

Tomorrow morning I'll take my last shower in the present bathroom. I don't think I'll have any regrets... it's served us well for the past ten years, but I'm not going to miss it.