Showing posts with label plumbing. Show all posts
Showing posts with label plumbing. Show all posts

Friday, May 16, 2025

Replumbing the mains water

 I check our electricity usage most days. I've done so ever since we discovered that the old meter for our guest flat was faulty. But I rarely check the water. The cost of water in Cyprus seems remarkably low, given how scarce water is, and we just paid the bills, with a quick glance at the usage each time. It was typically between about 20 and 35 metric tonnes each quarter, and never more than about 70 euros, often rather less. 

But then early in February, we received a bill where the cost was a lot higher than usual. And a quick glance at the consumption bar graph showed this:

What, we wondered, could have triggered such a high water usage in the previous three months? We hadn't been watering the garden much, because it was the winter. We had previously had problems with water tanks that led to somewhat higher bills, but never this high. And we hadn't had any problems with our tanks for some time. Occasionally one of the toilets would keep flushing water through, but we usually noticed and it never lasted for long. 

We wondered if the meter was faulty. But thought we had better check first to see if we could work out what was going on. Neither the washing machine nor dishwasher was running, and none of the taps were dripping. The toilets had filled up - there should not have been any water usage. But the little dial on the meter was, albeit slowly, going around. So Richard turned the water off, and it stopped. Apparently not a faulty meter, then. 

What seemed likely was that there was a leak in the pipes running between the meter and the boiler room. Unfortunately, those pipes were underneath the driveway, impossible to access without digging it up. Not something we could do, and we didn't like to think what it might cost, let alone the potential disruption, if we could even find a plumber who might be willing to try. 

But Richard had a better idea. He had been planning to re-plumb the house either later this year, or next year anyway. For the mains water, he wanted to replace the old black plastic piping with a new type that's less flexible as it has an aluminium centre. Apparently the old style pipes are easier to join, but no longer meet European standards, as older pipes can contaminate the water with chemicals. 

So he checked Mr Bricolage, our local DIY shop, and found that it was easy to find lengths of the correct kind of pipe:

new style pipes for drinking water

However, he had a busy few weeks ahead of him, so knew that it wasn't something he could tackle immediately. Since we didn't want to continue wasting such a volume of water, we got into a routine of switching the mains off for most of the day. It turns out to be a great blessing in this kind of situation that we still have cold water tanks as well as hot water tanks, which supply the water for the shower, sinks, toilets and appliances. The kitchen sink has a special knob to turn to get mains water for drinking.

So, every morning for about three months, after my walk or shopping, I would turn the mains water on for half an hour or so. I would then fill up water jugs with mains water for drinking, while the water tank on the roof filled up again. I also kept careful note of how much water we used each day.  

The water bill states (in Greek) that each person in a household, on average, typically uses about 11 cubic metres of water per quarter. So that would be 22 cubic metres (or metric tonnes) per quarter for two of us, and dividing that by 90 days, works out at around 244 litres, total, per day. I was pleased to find that we used between 190 and 250 litres per day, with the higher ones being days when we ran the washing machine, the dishwasher (sometimes twice, if we were entertaining), and also watered the plants.

However, on one day when I somehow forgot to turn the mains water off again until late afternoon, we used over 500 extra litres. The leak underground, if that's what it was, was getting worse. 

When our next bill arrived, a couple of weeks ago, I was pleased to see that it was around 50 euros, with a quarterly consumption of 21 cubic metres. Just under the expected 'average', despite the wastage at the start of the period, and on the day when I forgot to turn it off. I had become quite accustomed to my daily filling of jugs, but Richard decided that the time had come to replace the pipes. So he measured carefully, bought the pipes and fittings, and one of our local teenage friends came to help.

It was more complex than they had expected - as tends to happen with this kind of project - but this is just after the meter was disconnected from the old underground pipes and connected to the new ones:


I'm no good with that kind of thing, and our young friend is strong, and flexible. She is also very interested in this kind of thing, and, being considerably younger than we are, has no problem getting up and down, attaching the new pipes neatly to the wall. 

They worked for about three hours on Tuesday afternoon, and another three or four hours on Wednesday morning. There were a few glitches when one of the fittings in the boiler room wasn't quite right, but eventually all was done. It seems very strange not turning the water off each morning, and I am still checking the daily usage... but it seems to be as it should be. Richard was evidently correct in his surmise that the underground pipes were leaking.  

In the next week or two, they are going to replace the guest flat piping in the same way.

Monday, August 12, 2024

August in Cyprus and a plumbing manifold replacement

When I got back to Cyprus on August 6th, Richard was supposed to be away, working with his PA kit at a conference elsewhere on the island. So it was something of a surprise to get a text message, after the plane landed, saying that he would be meeting me. It was nice to have a few unexpected hours together. But it was very stressful for him as he came up against bureaucracy and other problems. However, he eventually arrived at the conference venue the following afternoon. 

I had hoped for a relatively peaceful week. It always takes me a few days to get over the brain-fog and exhaustion that hits me when I return to Cyprus. The heat and humidity don't help, but in early August it wasn't as hot as it had been in July.  32-33 degrees in the daytime, rather than 37-38 (or more). 

I was delighted to find a 'Foody' voucher in my email, reminding me that I hadn't used their delivery service for six weeks. Not really surprising, as I hadn't been in Cyprus for that period.  So I ordered a  takeaway salad that cost me almost nothing by the time the voucher was used, and provided a good meal for me without any effort. Not just on the day after I arrived back; there was plenty for lunch the following day, too. Which turned out to be a good thing...

The following day was not my favourite of the week. In our guest flat, Richard had discovered a slow leak in one of the pipes in the bathroom. Someone had put a small plastic container at the back of the sink cabinet to catch the drips, but had forgotten to let us know that there was a drip. We didn't know how long this had been going on, but there was some significant rust and it was clear that the 'manifold' was rusty and needed replacing. 

I had no idea what a manifold was, so Richard sent me a helpful diagram:

Our young friend L had been in Cyprus over the summer and had done several jobs for us, in our bathroom and elsewhere. But this was not something he felt able to do. So Richard asked a plumber whom we know to take a look. He is very busy, and said he could slot us in on the Wednesday after I returned. Which would have been okay, except that there was a family staying in the guest flat: friends of friends, who have stayed before. They usually go out for most of the day, but were not happy at the idea of an unknown plumber and his mates being in the flat without anyone else there.

So I had agreed to be in the flat with the plumbers. 

They arrived about 11.30, an hour earlier than they had specified. So I wasn't prepared or ready for them. Thankfully they left again for a break around 12.45 saying they needed to get some extra parts. So I was able to get upstairs again to the part of the house where we live. I ate my lunch at speed, and made a frappe, and used the loo... something I could not have done downstairs with the plumbers working in the bathroom. 

Then I filled my water bottle and found a book to read. They returned about two o'clock, and told me that they would probably be another two hours. At half past three, they said they probably wouldn't be finished before five. At five o'clock, they still weren't finished... 

I managed to read an entire book that day. I had to sit in the guest flat without using the air conditioning, since the plumbers wanted the front door open - they were in and out constantly to their van.  It took me a few hours before I realised I could at least turn on a fan. 

It took over six hours in all, with three guys on the job. We still don't know why it took so long, but the result looked good:  


As a friend commented, a manifold a bit like an octopus. Although ours doesn't have eight 'legs'. 

But the day was so draining it took me another couple of days to feel myself again. 

Saturday, December 30, 2017

A few more Cyprus quirks...

Although we've lived in Cyprus for twenty years now, there are still occasions when we smile, or roll our eyes, and mutter, 'This is Cyprus!' It's a phrase used by Cypriots as well as ex-pats, often with a sense of pride in the way the island functions. Below are three recent examples:

1.  Central heating pump

Our main floor and the upstairs have separate pumps in our central heating system. About a year ago, we weren't getting any heat on our main floor. Not such a problem in Cyprus as it would be in, for instance, the UK; but some days are decidedly chilly. Our builder recommended a central heating engineer who came to have a look. He said we needed a new pump, so we asked him to fit one. However, instead of buying a new one, he found one that was being discarded by a school, and fitted that. The heating worked - mostly - for the rest of the winter.

But by the time it got cold again a few weeks ago, it was obvious we needed another replacement. Richard decided we would buy one ourselves, and then just ask a plumber to fit it, rather than risk another poor quality one. We went to a suitable local shop, where we were told that yes, they could sell us the exact same pump as our original one but that they recommended another which worked the same and was half the price. We would have bought the most expensive one if they hadn't been so insistent that their own brand was as good (and guaranteed). It was a positive 'This is Cyprus!' moment.

So we asked the shop if they had a recommended engineer who could fit it; preferably one who speaks English.  Yes, they told us, we should speak to George.  I don't know how many scraps of paper we've seen over the years with a phone number and the name 'George'.  Richard phoned him, and he said he would come later that day, or the following morning.

We waited, but nobody appeared. So Richard called, and he said yes, he would come later in the day.  He didn't.  He had many good reasons for not coming when he said he did, but after about the fifth day we were starting to feel rather frustrated. It was a not so good 'This is Cyprus!' experience that is all too familiar.

However, he did eventually come, fitted the pump efficiently and quickly, and even told us why the gas-powered part of our water heating has never worked.  He looked at a drip on the roof and said that one of our water tanks was faulty.  He then looked at a toilet which was very difficult to flush, and made a quick adjustment.  He was competent, quick (once he got here) and charged us just €30 for his time.

2. Curtain track 

Most of the curtains in our house have pull-cords.  And for about ten years or so, they worked just fine to open them in the morning, and close them at night.


Perhaps it's not obvious from that photo, so here's a close-up of the bit we pull:


In the past few months, however, first one curtain and then a couple of others started to jam. They wouldn't open - or wouldn't close - using the pull-cord.  We thought perhaps the cord needed to be replaced, as it looked a little frayed in places, so we bought some new cord. But quickly realised, when we took one down to try and replace the cord, that the problem is in fact with the mechanism at the end of the track that guides the cords:


There are two little wheels at each end, in a metal enclosure, and they were stuck. One of them broke off completely. We realised that the pelmets with the curtain rails have probably been here for thirty years or so... and the little wheel mechanism things needed to be replaced.

So Richard took the track off, and we went to a local shop that sells curtains and fittings.  The person on duty shook her head, and said it was a 'very old' fitting, one that could not be replaced. She said we would have to replace the entire metal track with a new fitting, and that each one would cost at least €25.  Since we have ten of them in all, which will need to be replaced eventually, this seemed a bit steep.  Moreover, the new track which the shop assistant showed us was exactly the same size as the one we have already. "Couldn't we buy just the new mechanism and fit it in the track?" we asked.  No, they insisted, it was too old.

Another oddity of Cyprus is that similar shops tend to congregate in the same area. So we thanked the shop assistant, and went to the next curtain shop, a couple of doors down the same street. We asked the same question.  They, too, said that our mechanisms were too old to be replaced, and that we would need a new track.

But they said it would only be €10 for the replacement.

We were startled at such a price difference, but thought we might as well pop into the third curtain shop that was in the same street, just another couple of doors down.

This time, however, the assistant assured us that yes, 'of course' we could replace the old mechanisms. They don't have them in stock right now, she said, but they could get some in. No, we don't need to make an order, just come back next Friday.  The cost?  €5 for two.

Yes, 'This is Cyprus!'

So, we'll go back there next week and see if they really can provide an exact replacement.

3.  Airport parking

Larnaka's old airport was replaced many years ago with a new, improved and mostly pretty efficient airport.

Unfortunately,  they have never really sorted out how the parking works.

At first, when dropping someone off or meeting a flight, there was twenty minutes of free parking in the short-term car park. If one parked for longer, there was a parking cost, but it wasn't too excessive. Of course, we, like many of our friends, would sometimes go back to the car after fifteen minutes, drive it out of the car park and then park somewhere else, so as to avoid paying - but in most cases, twenty minutes was plenty.

Then they started charging for all parking.  So people started not using the car park; instead they (and we..) would drive around while waiting for a call, or have one person get out to meet arriving guests, while the driver would find somewhere to stay temporarily, until a phone call alerted them of the arrival. But more and more people did this, and the roads around the airport became clogged, and then the authorities started putting up barriers, or cones, to stop even temporary parking.  They blocked off some of the car parks completely... but the main short-stay car park really isn't big enough.  So at times when we do want to park, sometimes Richard drives around for five minutes or more, just looking for a space.

On Wednesday morning we took Tim to the airport.  We decided to go in with him for half an hour or so, and were there in plenty of time. As usual, the car park looked absolutely packed. So Richard dropped Tim and me near the entrance while he went to look for a parking space.  We thought the airport would be heaving with people, as it often is, given the number of cars that were parked.

To our surprise, it was extremely quiet. There was no queue at all, so Tim checked his luggage in immediately.  Apparently the flight was almost empty.  We sat down and chatted for a while, and during that time saw very few people. Evidently December 27th is not a popular time for flying out of Cyprus. There didn't seem to be many arrivals, either.

So we were not just saying, 'This is Cyprus' in a frustrated way about the lack of parking spaces at the airport, we were genuinely puzzled:  why, with so few people in the airport, was the car park as full as ever...?

We wondered if it was long-term parking, for people who had gone away for a week or two over Christmas, but thought that was unlikely, as there's a separate covered long-term car park.  Could it be for staff?  No, they too have their own separate car park.

Then I discovered that instead of the long-term car park being better value than the short-term one for more than 24 hours of parking, it's more expensive. Indeed, the airport site actually suggests that people consider long-term parking in the short-term car park.

No wonder there's such a problem.  But... 'This is Cyprus!'

Saturday, February 25, 2017

The Peculiarities of Plumbing in Cyprus

One of the comments made, now and then, by friends or relatives visiting us in Cyprus is that the skyline is somewhat spoiled by all the water tanks and solar heating panels.  We've got used to them ourselves, after nearly twenty years living on the island, but they do have a point. This, for instance, is typical:

water tanks and solar panels are a feature of Cyprus roofs

(If the image seems too small, clicking it should lead to a bigger, clearer view). 

Whereas in cooler countries, hot water tanks are usually indoors, and insulated with warm lagged jackets, in Cyprus they are outside, on the roof, and (so long as the sun is shining) water is heated by the large solar panels.

Cold water tanks seem very old fashioned to many who don't live in Cyprus, but for many years there was a severe drought on the island. When we moved here, mains water was only switched on a couple of times per week. So it was vital to have cold water storage tanks for use in between times.

Most kitchen taps are still equipped with both mains and tank water availability, with the mains (sometimes filtered) for drinking, and the tank water, hot and cold, for washing dishes. Our dishwasher and washing machine run from the tank, as made sense during the drought years. Nowadays, with recent rainy years and the functioning desalination plants, water is on almost all the time, and some people now have their machines attached directly to the mains water inlets.

Since our house is in two parts, with a separate flat underneath the main part where we live (fairly typical in Cyprus) we have four tanks in all.  The hot ones, fed from the larger cold ones above them, are heated by the solar panels.


The trouble with tanks being on the roof is that, despite being strong and long-lasting, they are at the mercy of the elements. The sun is very hot in summer, and in recent years the winds have been extremely strong at times in the winter.

Seven-and-a-half years ago, we had to have the guest flat cold water tank (the one nearest the edge) replaced, due to a serious leak in the side. We had the pump fixed too, and various other repairs, and everything worked nicely. It was a little frustrating that the hot water never seemed to stay hot for more than an hour or two in the evening, after the sun had gone down, and Richard muttered now and again about having some extra insulation. But we have an electric water heater to supplement the solar power, so we used that when we needed hot water in the evening, or before it had warmed up sufficiently in the morning.

Now and again we noticed that drips were starting again, and we called in plumbers - I think we've used three different ones now, maybe more - who repaired problems in pipes, or outlets, or, on occasion, the ballcocks that are supposed to regulate when the tank stops filling up.  The latter seems to be a common problem; one of our neighbours has a tank that overflows for short periods regularly, as can be seen by the marks down the side of the top tank:

showing the drips down a cold water tank on a roof in Cyprus

Last year we realised that we were seeing were yet more drips, and they weren't just sporadic. We looked at them, and sighed, and said something had to be done. But it didn't seem like a huge problem and we didn't get around to it.

Then one day towards the end of the year, we had water not just dripping onto the balcony below the tanks, but pouring down. We called our friendly local plumber, who came pretty quickly and said that there were two issues. The guest flat hot water tank had developed a serious leak in one of the seams, and was spewing water out. That one was fairly easily fixed, which is good because some of the water was also leaking inside our roof and dripping through the bathroom ceiling.

However, the other hot water tank had a hole that couldn't be fixed, and needed to be replaced completely. But we couldn't have a tank off the shelf; it's pressurised and had to be built specially. So the plumber put in an order, and hoped it would be ready to install before Christmas.

Unsurprisingly, that didn't happen and we were in the UK with the family by the time Richard had a text message to say that the tank was ready.  By the time we were back in Cyprus, the plumber had too many other jobs, then Richard went away again.  Finally a date was arranged, only to discover that the company who had built the new tank had given up waiting for it to be claimed, and sold it to someone else.

But finally, a couple of weeks ago, the plumber arrived with a couple of other guys and the new tank. It took them a couple of hours to put it in place, and everything looked good. There was some slight confusion in that it looked, from the wiring, as if it was the guest flat tank and not the main house one... apparently both the wiring and the pipework are 'interesting'. As is not atypical in this country.

However, there were no more leaks for the rest of the day, and to our delight, the new tank is much better insulated than the old one was, meaning that the water is still hot enough for a shower even four hours after the sun has gone down on a chilly day.  It wasn't cheap having this new tank, but over a few years we should save quite a bit on our electricity bill.

The night after the new tank was installed, I thought I heard a drip, and saw a bit of a puddle on the balcony after dark. But it had been a cloudy day, and I thought perhaps it had rained. The following morning the balcony was dry, and there were no more drips for nearly a week.

However, we had people staying in our guest flat for that week. The day after they departed, there were more drips, which - as far we could tell - were coming out of the guest flat cold water tank, or possibly one of the pipes nearby.  Puddles were appearing yet again on the balcony:

puddle of water due to drips from our water tank, yet again

I thought I could temporarily stop the drips by switching off the guest flat mains water, thinking it might be an overflow problem. So I did that... but it made no difference.

So Richard called the plumber, who came to take a look. He said it was an overflow problem, and the ballcock wasn't working. So he used a little stopcock valve next to the tank to stop water going into it. He was rather surprised to discover, when up the ladder, that there was no round cover at the top of the tank, so it's open to the air... but said he could replace that too, early next week.

The dripping stopped... for a couple of hours.

By evening, it had started again. This makes no sense at all, but then I couldn't understand how the tank could still be leaking when the mains water to it is switched off.  We now think there must be some serious problem with pressure somewhere in the system, in a way that I don't begin to understand.

Life is never entirely straightforward in Cyprus.